We have had a contractor working in the basement to finish it off.
This picture is taken from the area where the sewing room and Eds office are looking towards the back door. He opened the door ways more to make it a little bigger in that area.
This door way opening on the right goes into the bathroom. This is at the bottom of the steps, through the area that we opened up in the first picture. The opening to the left goes into Eds workshop area and another area that will have an big opening to look into what was Eds workshop.
No comments:
Post a Comment